Home | MyGov

Accessibility
Accessibility Tools
Color Adjustment
Text Size
Navigation Adjustment
Screen Reader iconScreen Reader

Give your inputs on Kakinada Area Based Development Proposals

Give your inputs on Kakinada Area Based Development Proposals
Start Date :
Nov 20, 2015
Last Date :
Dec 01, 2015
00:00 AM IST (GMT +5.30 Hrs)
Submission Closed

Requesting citizens to give their valuable opinions on mentioned aspects and Area based development proposals mentioned under them. ...

Requesting citizens to give their valuable opinions on mentioned aspects and Area based development proposals mentioned under them.

Aspect: Economy and Employment

• Development of Godavari Kalaksehtram at Vivekananda Park (Kulayee Cheruvu)
• Convention Centre and Budget Hotel at Old Municipal Travelers Bungalow
• Development of shopping complex with multiplex in 2 acres open land at Waterworks
• Upgradation of RTC Bus Complex

Aspect: Education

• Implementation of e-pathasala including digital podium, interactive pad, interactive board, interactive projector, visualiser, information kiosk, touch LED
• Up gradation of school infrastructure like fans, LED lights, chairs, toilets, etc.
• KMC with the support of Agastya International Foundation is proposed to develop science centre and mobile science lab.

Aspect: Health

• Up gradation and improvement of Government General Hospital
• Up gradation of existing E.S.I Hospital
• Develop walking tracks and promote health habits

Aspect: Public Open Spaces

• Target to increase in green coverage by 15% by improve the greenery in Gandhinagar Park & Raja Tank and by developing colony parks & neighborhood parks
• Geo-tagging of all the trees in the area to check the unauthorized cutting of trees and improve the greenery

Aspect: Housing & Inclusiveness

• KMC is preparing a comprehensive report to make Kakinada a slum free city.
• Improve the Identified 10 No. slums in the area under housing for all scheme.

Aspect: Transport and Walkablity

• Developments of Footpaths and Cycle Tracks – about 25km length of footpaths and cycle tracks have to be developed along the roads
• Implementation of paid smart parking on main road, cinema road, temple street, around raja tank and other roads

Aspect: IT Connectivity

• 100% WiFi connectivity

Aspect: Energy Supply

• Uninterrupted power with zero outages

Aspect: Energy Source

• Convert all street lights into Solar LED
• Implement the roof top solar projects for all government and public buildings (around 5.2 lakhs ft roof top area)

Aspect: Water Supply

• All households with service connection and 24 x 7 water supply
• Install smart water meters

Aspect: Water Management

• Promote rainwater harvesting / ground water recharge.

Aspect: Sanitation and Waste Water Management

• 100% household and community toilets
• 100% sewer connections (19,451 Connections)
• 100% area covered with sewerage (850 acres)
• Develop decentralized sewage treatment plants (More than 1)
• Open Defecation free area

Aspect: Energy Efficiency

• All households lighting to be converted to LED with assistance of Ministry of New and Renewable Energy (MNRE) and Bureau of Energy Efficiency (BEE)

Aspect: Underground Electric Wiring

• 100% underground electric wiring of 850 acres duly proposing under Integrated Power Development Scheme (IPDS)

Aspect: Waste Management

• 100% D2D Collection
• Recycling of Dry Waste and Explore the Plastic to Fuel technology
• Decentralized wet waste to compost / bio-methanation plants
• Monitoring and supervision of services by implementing Information Communication Technology initiatives

Aspect: Safety & Security

• Installation of CCTV at junctions and all locations including apartments, commercial buildings, public places, institutional buildings, government buildings, railway stations, bus complex, etc.
• Improvement of traffic junctions and road markings

Last date of giving your suggestion is 30th November, 2015.

Reset
Showing 747 Submission(s)
apparaos
apparaos 10 years 6 months ago
Narayanamma-65-Age Sovubagyaveddhi,d.no:30-9-10 Drainage system There is no Community Hall in these ward. Rainy Season Snakes coming in to the house. Transportation of facilities
apparaos
apparaos 10 years 6 months ago
Athama vari street: d.no:30-10-7 Road development in wards and it should be width Drainage problem no floating in rainy season Water problem in all areas of 32nd ward
apparaos
apparaos 10 years 6 months ago
Draiange Canal development near Railway gate Buffalowe should at one place it should not near to houses getting mosquitos to houses
nageswari
nageswari 10 years 6 months ago
Nandeswari: street Mallikarujunara Development of Street Lighting Railway gate Speed Beaker heavy dogs Development of Summer season water Problem in summer Street bores